We periodically schedule maintenance outages to perform preventative tasks to keep the systems running smoothly. The entire system will be taken offline during an outage and you will not be able to access the system or submit jobs. We notify all OSCER users via e-mail in advance of an upcoming maintenance outage.

Upcoming Scheduled Outages

There are currently no scheduled outages.

Past Scheduled Outages

DateMaintenance Tasks
July 31, 2019
  • Upgrade the file system on home1 and home2
  • Perform routine maintenance on scratch servers
May 30, 2019
  • Increase RAM for the SLURM virtual machine
  • Increase RAM for the LDAP virtual machine
  • Upgrade firmware on all network switches
  • Re-stack core network switches
  • Standardize card versions across the cluster
April 11, 2019
  • Address performance issues with the high performance file system affecting very large scale jobs
January 30, 2019
  • Apply security patches
December 5, 2018
  • Maintenance tasks on the scratch file system
  • Apply new configurations to the job scheduler (Slurm)
August, 22, 2018
  • Apply patches and firmware upgrades
July 25, 2018
  • Replace bad memory in one of the cluster virtualization nodes
April 25, 2018
  • Add metadata drivers to LUSTRE file system
  • Deploy ZFS compression on NFS scratch servers 1 & 2
April 4, 2018
  • Apply security patch to the job scheduler (SLURM)
  • Update firmware across the cluster
January 31, 2018
  • Upgrade the job scheduler (SLURM) to the latest version
January 5, 2018
  • Patch the Operating System to address the Meltdown security vulnerability
December 13, 2017
  • Upgrade firmware on Schooner's Ethernet switches
November 29 & 30, 2017
  • Upgrade LUSTRE scratch system version & firmware
September 6, 2017
  • Apply firmware upgrades to scratch and /home servers
  • Apply kernel updates to scratch and /home servers
  • Upgrade the job scheduler (SLURM)
June 21, 2017
  • Increase amount of scratch storage space
March 22, 2017
  • Apply critical kernel updates to address security vulnerabilities
  • Upgrade the job scheduler (SLURM) to the latest version
  • Re-cable several nodes in the cluster
December 14, 2016
  • Maintenance of Lustre (fast scratch)
September 28, 2016
  • Replace battery for storage controllers
  • Apply firmware upgrades to Schooner disk drives
July 20, 2016
  • IB Core Split Re-cabling
  • Fix IP v6 Addressing
  • DTN Nodes
  • SLURM PAM
  • Tape Backups
June 22, 2016
  • IB Core Recable
  • Firmware updates on support nodes
  • Enable slow scratch
  • Cable PDU MGMT ports
  • Repair GID 9999